<xmp id="uauy4"><u id="uauy4"></u>
  • <menu id="uauy4"><tt id="uauy4"></tt></menu>
    <xmp id="uauy4"><menu id="uauy4"></menu>
  • <menu id="uauy4"><strong id="uauy4"></strong></menu>
    <input id="uauy4"></input>
  • Language:CHINESESENGLISH

    Home > News > Inspection and appraisal of steel structure workshop
    CONTACT US
    • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
    • Phone:0757-81002668/0757-63323396
    • Fax:0757-81196682
    • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
    • E-mail:sbs@sbsprefabhouse.com
    • URL:http://www.uewkhdshfiueyhfsahd.com

    Inspection and appraisal of steel structure workshop

    Time:[2022-11-5]  Hits:1996

    The factory is a place where benefits are created, and the safety needs of the factory are highly valued. If the factory has quality problems, it will not only pollute the environment, but also seriously affect the personal safety of workers. Therefore, before the plant is put into operation, it is necessary to hire a qualified testing organization to conduct plant quality testing, so as to find out the construction problems in time. What are the items to be inspected when conducting factory quality inspection? First, check the normal operation performance of the plant; Secondly, test its performance and decoration equipment, and check whether it has the ability to deal with safety emergencies.

     


    Main contents of inspection plan for steel structure workshop

    The inspection items shall be confirmed according to the on-site investigation, and the corresponding inspection scheme shall be formulated. The detection scheme should include the following main contents:

    1. Overview, mainly including design basis, structural form, building area, total floors, design, construction and supervision units, and construction unit

    2. Test purpose or test requirements of the client

    3. Test basis, mainly including the specifications and relevant technical data on which the test is based

    4. Test items, selected test methods and quantity

    5. Inspection personnel and instruments

    6. Inspection progress plan

    7. Required cooperation between the client and the testing unit

    8. Safety measures in detection

    9. Environmental protection measures during testing

    Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
    99久久精品国产亚洲