日本欧美一区二区三区不卡视频_亚洲欧美日韩中文字幕一区二区_日韩免费视频一区二区_欧美黑人粗大猛烈18p

9000px;"><xmp id="uauy4"><u id="uauy4"></u>
  • <menu id="uauy4"><tt id="uauy4"></tt></menu>
    <xmp id="uauy4"><menu id="uauy4"></menu>
  • <menu id="uauy4"><strong id="uauy4"></strong></menu>
    <input id="uauy4"></input>
  • Language:CHINESESENGLISH

    Home > News > Key control points for steel structure engineering supervision work
    CONTACT US
    • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
    • Phone:0757-81002668/0757-63323396
    • Fax:0757-81196682
    • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
    • E-mail:sbs@sbsprefabhouse.com
    • URL:http://www.uewkhdshfiueyhfsahd.com

    Key control points for steel structure engineering supervision work

    Time:[2023-8-16]  Hits:2062

    01

     

    Qualification review of construction units

     


    Due to the strong professionalism of steel structure engineering, there are high requirements for professional equipment, processing sites, workers' quality, as well as the construction technology standards, quality assurance system, quality control and inspection system of the enterprise itself. Generally, it is mostly subcontracted under the general contract. In this case, the qualification and management level of the construction enterprise are quite important. Therefore, qualification review is an important link, and its review content includes:


    (1) Whether the construction qualification and business scale meet the engineering requirements. (2) Whether the construction technical standards, quality assurance system, quality control and inspection system meet the requirements of engineering planning technical indicators. (3) Inspect whether the production capacity of the construction enterprise meets the requirements of the project schedule.

     

    02

     

    Review of Welder Qualifications

     


    Welders must pass the exam and obtain a certificate of qualification, and certified welders must perform welding on their approved projects and scales. (1) Number of views: All views (on-site personnel). (2) Inspection method: Check the welder's qualification certificate, its recognized scale, and validity period.

     

    03

     

    Drawing review and technical preparation

     


    According to the drawing review procedure in the supervision plan, understand the drawings before the start of the project, convene and preside over the drawing review by professional technical personnel from the planning, owner, supervisor, and construction unit. Based on the planning documents and related materials and standards, address any errors, omissions, irrationality, non compliance with standards, and national construction documents in the construction drawings before construction. Coordinate with the owner, planning, and construction units to determine specific treatment measures or plan optimization for drawing issues. Urge the construction unit to organize the minutes of the joint review, and distribute them to all units after all parties sign and stamp them.

     

    04

     

    Review of construction organization planning (plan)

     


    (1) Urge the construction unit to prepare a special construction organization plan (plan) in accordance with the construction contract. After approval by its superior unit, it shall be reported to the supervisor. (2) After review, if the construction organization plan (plan) needs to be changed during construction, the reason and content of the change must be reported to the supervisor and the construction unit for review and approval before the change can be made.

     

    05

     

    Regular meetings

     


    Organize and participate in a weekly construction site meeting jointly attended by the construction, construction, and supervision units to promptly solve construction problems.

     

    06

     

    Key points for specific control of steel structure engineering preparation work

     


    (1) According to the Unified Standard for Construction Quality Inspection of Building Engineering GB50300-2013 and the Standard for Construction Quality Inspection of Steel Structures GB50205-2020, as a sub project, it is divided into sub projects such as steel structure welding, fastener connection, steel parts and steel component processing, steel component assembly, steel structure pre assembly, steel structure device engineering, profiled metal plate, steel structure coating, etc Regarding the raw materials of steel structures (including steel, welding materials, coating materials, etc.), they have a significant impact on the quality of steel structures and are separately included in the steel structure standards.

    (2) Check the welder qualification certificate, its recognition scale, and validity period.

    (3) The construction party shall conduct welding process evaluation on the steel, welding materials, welding methods, welding heat treatment, etc. used for the first time, and determine the welding process based on the evaluation report. The supervisor has reviewed all the welding process qualification reports and reviewed them according to the planned weld quality level standards. (4) Before installing steel components, check the positioning axis (bay size and span size) and elevation of the building, as well as the standards and fastening of embedded parts, which should meet the planning requirements. (5) When the embedded steel plate on the reinforced concrete bracket top of the engineering column is directly used as the bearing surface of the steel component, the allowable error in the position of the embedded steel plate on the bearing surface should comply with the standard regulations. (6) Steel components should comply with planning requirements and the provisions of this standard. The deformation and coating detachment of steel components caused by transportation, stacking, and lifting should be corrected and modified. (7) The supporting surface of steel components should not be less than 70% of the contact surface between the top and the embedded steel plate surface, and the maximum gap at the edge should not be greater than 0.8mm. (8) Before painting, the surface of the steel should be embroidered in accordance with the planning requirements and current national standards. The treated steel surface should not have welding slag, welding scars, dust, oil stains, water, and burrs. (9) The coating, number of coating passes, and coating thickness should all meet the planning requirements, with an allowable error of -25mm. The allowable error for each layer of dry paint film thickness is -5mm. (10) The appearance of components should not be painted incorrectly or missed, and the coating should not peel or rust back. The coating should be uniform and free from obvious wrinkles, sags, pinholes, and bubbles. (11) According to the actual situation and structural form of the project, the division of inspection batches for each sub project is determined: 1) Steel structure welding sub project: for the project, each frame can be used as an inspection batch; Inspection batches can also be divided into several inspection batches based on different types of steel structure units or components combined with steel structure production and device sub items. 2) Fastener connection sub project: For the project, inspection batches can be divided based on different steel structure units and fasteners of different standards. 3) Steel parts and components processing: Steel parts and components can be divided into several inspection batches according to different types. 4) Steel component assembly: For large steel structures, the steel components produced by the factory need to be assembled into steel components as lifting units before lifting. Due to the high requirements for component assembly, several components can be used as one inspection batch based on the actual situation on site. 5) Steel structure pre assembly: For disorderly shaped steel structures, in order to ensure smooth assembly during high-altitude installation, pre assembly between relevant components needs to be carried out on the ground after production. Inspection batches can be divided according to the assembly between similar components as one inspection batch. 6) Steel structure installation: Steel structure installation can be divided into single-layer steel structure installation sub items or multi-layer and high-rise steel structure installation sub items. Single story steel structure installations can be divided into several inspection batches according to engineering zoning. Multi story and high-rise steel structure installation projects can be divided into one or several inspection batches according to the floor or construction section. 7) Molded metal plate engineering: Molded metal plate engineering includes molded metal plates used for roofs, wall panels, floor slabs, and other areas. From the material perspective, it can be divided into profiled steel plates with anti-corrosion coating on the surface, profiled aluminum plates, etc. It can be divided into one or several inspection batches based on deformation joints, floors, construction sections, or roofs, walls, floors, etc. 8) Steel structure coating engineering: The steel structure coating engineering includes anti-corrosion coating and fireproof coating. The division of inspection batches can be divided into one or several inspection batches according to the principles of steel structure production or steel structure installation engineering inspection batches. (12) The quality inspection content and corresponding qualification standards of sub projects should comply with the following provisions: 1) Steel structure welding, fastener connection, steel parts and components processing, steel component assembly, steel component pre assembly, steel structure device, profiled metal plate, steel structure coating and other sub projects should comply with the qualified quality standards; 2) Quality control materials and documents should be complete; 3) The inspection and witness testing results related to safety and function should meet the requirements of the corresponding qualified quality standards in GB50205-2020 standard;

    Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
    日本欧美一区二区三区不卡视频_亚洲欧美日韩中文字幕一区二区_日韩免费视频一区二区_欧美黑人粗大猛烈18p
    <xmp id="uauy4"><u id="uauy4"></u>
  • <menu id="uauy4"><tt id="uauy4"></tt></menu>
    <xmp id="uauy4"><menu id="uauy4"></menu>
  • <menu id="uauy4"><strong id="uauy4"></strong></menu>
    <input id="uauy4"></input>
  • 不卡一区二区在线| 在线91免费看| 777午夜精品视频在线播放| 亚洲精品视频观看| 丰满岳乱妇一区二区三区| www.av亚洲| 一区二区三区精品视频在线| 狠狠色丁香九九婷婷综合五月| 欧美乱熟臀69xxxxxx| 日韩一区二区在线看片| 免费观看日韩电影| 久久精品国产精品亚洲红杏| www.亚洲在线| 国产亚洲成av人在线观看导航| 91免费国产在线| 日本少妇一区二区| 精品福利一区二区三区| 日韩欧美一区电影| 中文字幕久久午夜不卡| 成人黄色电影在线| 亚洲永久免费av| 日韩精品中午字幕| 欧美韩国日本一区| 亚洲欧洲av另类| 91网站最新地址| 91精品国产综合久久久久久漫画| 99在线精品观看| 成人av电影在线| 蜜臀久久久久久久| 日本一区二区三区在线观看| 午夜精品久久久久久久蜜桃app| 成人涩涩免费视频| 国产大陆精品国产| 国产欧美久久久精品影院| 日韩理论片网站| 国内精品免费在线观看| 成人国产一区二区三区精品| 国产精品一级二级三级| 国产精品影视在线观看| 欧美三级一区二区| 成人av电影观看| 在线成人免费视频| 成人高清视频在线观看| 亚洲影院免费观看| 欧美日本一道本| 精品少妇一区二区三区在线播放| 欧美一区二区在线免费播放| 亚洲精品少妇30p| 欧美日韩久久久| 精品亚洲免费视频| 亚洲欧美色一区| 岛国一区二区三区| 精品日韩欧美一区二区| 精品成人在线观看| 国内偷窥港台综合视频在线播放| 久久精品国产亚洲aⅴ| 日产精品久久久久久久性色| 国产日韩影视精品| 国产日韩精品视频一区| 欧美日韩国产美| 日韩专区在线视频| 日韩精品一区二区三区四区视频| 亚洲二区在线观看| 麻豆久久一区二区| 国产视频911| 久久精品日韩一区二区三区| 91麻豆自制传媒国产之光| 欧美日韩一区二区三区视频| 欧美日韩一区精品| 亚洲在线成人精品| 蜜臀av一区二区在线免费观看| 色老汉一区二区三区| 中文字幕一区二区视频| 亚洲日本丝袜连裤袜办公室| 26uuu色噜噜精品一区| 狠狠色丁香久久婷婷综| 美女国产一区二区三区| 麻豆高清免费国产一区| 欧美一区二区私人影院日本| 欧美做爰猛烈大尺度电影无法无天| 成人三级伦理片| 美日韩一区二区三区| 99视频超级精品| 欧美一级日韩不卡播放免费| 成人网男人的天堂| 在线观看免费成人| 中文在线免费一区三区高中清不卡| 国产在线不卡视频| 亚洲欧美日韩小说| 国产精品伦一区二区三级视频| 国产精一区二区三区| 亚洲激情校园春色| 在线观看亚洲一区| 91香蕉国产在线观看软件| 欧美一区二区三区免费| 欧美熟乱第一页| 欧美精品在线观看一区二区| 五月婷婷综合网| 日韩福利视频导航| 亚洲午夜一二三区视频| 91丨九色丨黑人外教| 7777女厕盗摄久久久| 26uuu精品一区二区| 欧美一区二区三区成人| 亚洲精品乱码久久久久| 视频一区在线播放| 在线观看视频欧美| 国产a区久久久| 成人av资源在线观看| 日韩一级片在线播放| 日产国产高清一区二区三区| 亚洲欧洲无码一区二区三区| 欧美一区二区三区公司| 波波电影院一区二区三区| 色狠狠桃花综合| 欧美色视频一区| 国产成人亚洲精品狼色在线| 精品少妇一区二区三区日产乱码| 日韩一区二区高清| 国产一区福利在线| 国产精品超碰97尤物18| 日韩在线一区二区| 免费观看30秒视频久久| 久久伊人蜜桃av一区二区| 亚洲精品你懂的| 亚洲欧美日韩电影| 亚洲美女淫视频| 激情六月婷婷久久| 欧美视频一区二区三区| 欧美一区二区三区视频在线观看| 亚洲免费色视频| 亚洲精品一区二区精华| 亚洲大片一区二区三区| 粗大黑人巨茎大战欧美成人| 色妹子一区二区| 欧美日韩国产天堂| 91精品国产综合久久香蕉麻豆| 国产成人精品影院| eeuss影院一区二区三区| 日本乱人伦aⅴ精品| www.欧美精品一二区| 国产精品69毛片高清亚洲| 国产高清不卡一区| 99天天综合性| 91美女在线观看| 欧美精品亚洲一区二区在线播放| 国产三级精品三级| 午夜精品免费在线观看| 91在线国内视频| 亚洲另类春色国产| 中文字幕日本乱码精品影院| 5566中文字幕一区二区电影| 亚洲午夜激情网站| 51精品秘密在线观看| 欧美日韩国产一区二区三区地区| 91亚洲资源网| 成人av网站免费观看| 国产三区在线成人av| 91麻豆国产福利精品| 亚洲午夜激情网站| 精品少妇一区二区| 色系网站成人免费| 欧美一区二区三区四区在线观看| 国产精品色婷婷久久58| 欧美久久一二三四区| 成人在线综合网| 色婷婷亚洲精品| 欧美一级理论片| 99国产精品久久| 国产精品综合av一区二区国产馆| 国产成人超碰人人澡人人澡| 久久亚洲私人国产精品va媚药| 1区2区3区国产精品| 日韩理论片网站| 久久久久久黄色| 欧美一卡2卡3卡4卡| 在线视频欧美精品| 精品写真视频在线观看| 国产精品亚洲综合一区在线观看| 亚洲精品一二三区| 久久成人免费电影| 亚洲一区二区欧美激情| 亚洲福利视频一区二区| 国产成人免费视频精品含羞草妖精| 中文字幕在线一区二区三区| 国产精品久久久久桃色tv| 欧美国产日韩亚洲一区| 欧美精品在线观看一区二区| 久久91精品久久久久久秒播| 91伊人久久大香线蕉| 在线观看日韩av先锋影音电影院| 国产一区激情在线| 99精品视频在线免费观看| 97久久精品人人做人人爽| 日本美女一区二区三区| 91国偷自产一区二区三区成为亚洲经典| 成人黄色777网| 国产精品看片你懂得| 国产午夜亚洲精品理论片色戒| 91久色porny|