    Home > News > Key control points for steel structure engineering supervision work
    CONTACT US
    • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
    • Phone:0757-81002668/0757-63323396
    • Fax:0757-81196682
    • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
    • E-mail:sbs@sbsprefabhouse.com
    • URL:http://www.uewkhdshfiueyhfsahd.com

    Key control points for steel structure engineering supervision work

    Time:[2023-8-16]  Hits:1680

    01

     

    Qualification review of construction units

     


    Due to the strong professionalism of steel structure engineering, there are high requirements for professional equipment, processing sites, workers' quality, as well as the construction technology standards, quality assurance system, quality control and inspection system of the enterprise itself. Generally, it is mostly subcontracted under the general contract. In this case, the qualification and management level of the construction enterprise are quite important. Therefore, qualification review is an important link, and its review content includes:


    (1) Whether the construction qualification and business scale meet the engineering requirements. (2) Whether the construction technical standards, quality assurance system, quality control and inspection system meet the requirements of engineering planning technical indicators. (3) Inspect whether the production capacity of the construction enterprise meets the requirements of the project schedule.

     

    02

     

    Review of Welder Qualifications

     


    Welders must pass the exam and obtain a certificate of qualification, and certified welders must perform welding on their approved projects and scales. (1) Number of views: All views (on-site personnel). (2) Inspection method: Check the welder's qualification certificate, its recognized scale, and validity period.

     

    03

     

    Drawing review and technical preparation

     


    According to the drawing review procedure in the supervision plan, understand the drawings before the start of the project, convene and preside over the drawing review by professional technical personnel from the planning, owner, supervisor, and construction unit. Based on the planning documents and related materials and standards, address any errors, omissions, irrationality, non compliance with standards, and national construction documents in the construction drawings before construction. Coordinate with the owner, planning, and construction units to determine specific treatment measures or plan optimization for drawing issues. Urge the construction unit to organize the minutes of the joint review, and distribute them to all units after all parties sign and stamp them.

     

    04

     

    Review of construction organization planning (plan)

     


    (1) Urge the construction unit to prepare a special construction organization plan (plan) in accordance with the construction contract. After approval by its superior unit, it shall be reported to the supervisor. (2) After review, if the construction organization plan (plan) needs to be changed during construction, the reason and content of the change must be reported to the supervisor and the construction unit for review and approval before the change can be made.

     

    05

     

    Regular meetings

     


    Organize and participate in a weekly construction site meeting jointly attended by the construction, construction, and supervision units to promptly solve construction problems.

     

    06

     

    Key points for specific control of steel structure engineering preparation work

     


    (1) According to the Unified Standard for Construction Quality Inspection of Building Engineering GB50300-2013 and the Standard for Construction Quality Inspection of Steel Structures GB50205-2020, as a sub project, it is divided into sub projects such as steel structure welding, fastener connection, steel parts and steel component processing, steel component assembly, steel structure pre assembly, steel structure device engineering, profiled metal plate, steel structure coating, etc Regarding the raw materials of steel structures (including steel, welding materials, coating materials, etc.), they have a significant impact on the quality of steel structures and are separately included in the steel structure standards.

    (2) Check the welder qualification certificate, its recognition scale, and validity period.

    (3) The construction party shall conduct welding process evaluation on the steel, welding materials, welding methods, welding heat treatment, etc. used for the first time, and determine the welding process based on the evaluation report. The supervisor has reviewed all the welding process qualification reports and reviewed them according to the planned weld quality level standards. (4) Before installing steel components, check the positioning axis (bay size and span size) and elevation of the building, as well as the standards and fastening of embedded parts, which should meet the planning requirements. (5) When the embedded steel plate on the reinforced concrete bracket top of the engineering column is directly used as the bearing surface of the steel component, the allowable error in the position of the embedded steel plate on the bearing surface should comply with the standard regulations. (6) Steel components should comply with planning requirements and the provisions of this standard. The deformation and coating detachment of steel components caused by transportation, stacking, and lifting should be corrected and modified. (7) The supporting surface of steel components should not be less than 70% of the contact surface between the top and the embedded steel plate surface, and the maximum gap at the edge should not be greater than 0.8mm. (8) Before painting, the surface of the steel should be embroidered in accordance with the planning requirements and current national standards. The treated steel surface should not have welding slag, welding scars, dust, oil stains, water, and burrs. (9) The coating, number of coating passes, and coating thickness should all meet the planning requirements, with an allowable error of -25mm. The allowable error for each layer of dry paint film thickness is -5mm. (10) The appearance of components should not be painted incorrectly or missed, and the coating should not peel or rust back. The coating should be uniform and free from obvious wrinkles, sags, pinholes, and bubbles. (11) According to the actual situation and structural form of the project, the division of inspection batches for each sub project is determined: 1) Steel structure welding sub project: for the project, each frame can be used as an inspection batch; Inspection batches can also be divided into several inspection batches based on different types of steel structure units or components combined with steel structure production and device sub items. 2) Fastener connection sub project: For the project, inspection batches can be divided based on different steel structure units and fasteners of different standards. 3) Steel parts and components processing: Steel parts and components can be divided into several inspection batches according to different types. 4) Steel component assembly: For large steel structures, the steel components produced by the factory need to be assembled into steel components as lifting units before lifting. Due to the high requirements for component assembly, several components can be used as one inspection batch based on the actual situation on site. 5) Steel structure pre assembly: For disorderly shaped steel structures, in order to ensure smooth assembly during high-altitude installation, pre assembly between relevant components needs to be carried out on the ground after production. Inspection batches can be divided according to the assembly between similar components as one inspection batch. 6) Steel structure installation: Steel structure installation can be divided into single-layer steel structure installation sub items or multi-layer and high-rise steel structure installation sub items. Single story steel structure installations can be divided into several inspection batches according to engineering zoning. Multi story and high-rise steel structure installation projects can be divided into one or several inspection batches according to the floor or construction section. 7) Molded metal plate engineering: Molded metal plate engineering includes molded metal plates used for roofs, wall panels, floor slabs, and other areas. From the material perspective, it can be divided into profiled steel plates with anti-corrosion coating on the surface, profiled aluminum plates, etc. It can be divided into one or several inspection batches based on deformation joints, floors, construction sections, or roofs, walls, floors, etc. 8) Steel structure coating engineering: The steel structure coating engineering includes anti-corrosion coating and fireproof coating. The division of inspection batches can be divided into one or several inspection batches according to the principles of steel structure production or steel structure installation engineering inspection batches. (12) The quality inspection content and corresponding qualification standards of sub projects should comply with the following provisions: 1) Steel structure welding, fastener connection, steel parts and components processing, steel component assembly, steel component pre assembly, steel structure device, profiled metal plate, steel structure coating and other sub projects should comply with the qualified quality standards; 2) Quality control materials and documents should be complete; 3) The inspection and witness testing results related to safety and function should meet the requirements of the corresponding qualified quality standards in GB50205-2020 standard;

    Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
    日本欧美一区二区三区不卡视频_亚洲欧美日韩中文字幕一区二区_日韩免费视频一区二区_欧美黑人粗大猛烈18p
    <xmp id="uauy4"><u id="uauy4"></u>
  • <menu id="uauy4"><tt id="uauy4"></tt></menu>
    <xmp id="uauy4"><menu id="uauy4"></menu>
  • <menu id="uauy4"><strong id="uauy4"></strong></menu>
    <input id="uauy4"></input>
  • 亚洲欧美在线网| 另类春色校园亚洲| 久久本道综合色狠狠五月| 亚洲国产成人在线视频| 国产精品日韩一区二区三区| 免费成人毛片| 国产精品毛片a∨一区二区三区|国| 国内外成人在线视频| 国产一区二区激情| 欧美私人啪啪vps| 亚洲国产精品精华液2区45| 日韩亚洲精品视频| 久久精品av麻豆的观看方式| 国产日韩欧美夫妻视频在线观看| 国外视频精品毛片| 久久久蜜桃一区二区人| 欧美午夜精品理论片a级按摩| 香蕉久久a毛片| 久久久精品日韩欧美| 中日韩美女免费视频网站在线观看| 亚洲级视频在线观看免费1级| 老司机精品视频一区二区三区| 欧美人妖在线观看| 久久久久一区二区| 欧美一区二区三区四区在线| 欧美亚洲一级片| 亚洲高清视频一区| 国产亚洲精品福利| 久久se精品一区二区| 亚洲二区三区四区| 在线一区二区视频| 美女91精品| 国产日韩精品一区二区三区在线| 久久九九精品99国产精品| 欧美aaa级| 国产一区91精品张津瑜| 欧美在线免费视屏| 国产日韩欧美在线观看| 午夜一区二区三区不卡视频| 国产精品麻豆成人av电影艾秋| 国产拍揄自揄精品视频麻豆| 国内精品久久久久影院色| 野花国产精品入口| 亚洲激情成人网| 国产日韩精品一区观看| 91久久夜色精品国产九色| 国产精品99久久久久久www| 国产在线欧美| 国产欧美日韩一区二区三区| 久久精品中文字幕免费mv| 亚洲欧美激情四射在线日| 亚洲午夜在线观看| 国产一区二区三区日韩欧美| 欧美日韩综合久久| 国产情侣一区| 亚洲第一黄色| 久久免费99精品久久久久久| 国产精品免费网站| 一色屋精品亚洲香蕉网站| 黑人巨大精品欧美一区二区小视频| 国产偷久久久精品专区| 在线观看欧美日韩国产| 一区二区高清视频在线观看| 亚洲精品网站在线播放gif| 久久精品国产免费| 卡一卡二国产精品| 在线观看日韩av先锋影音电影院| 欧美中文字幕视频在线观看| 久久久精品一区二区三区| 亚洲毛片播放| 欧美色图首页| 亚洲精品日产精品乱码不卡| 亚洲欧洲av一区二区三区久久| 国产精品激情av在线播放| 国产欧美日韩精品a在线观看| 欧美视频第二页| 欧美网站大全在线观看| 国产女同一区二区| 亚洲第一黄网| 国产精品性做久久久久久| 国产目拍亚洲精品99久久精品| 国产精品大片wwwwww| 国产精品美女久久久久久2018| 国产一区二区三区久久| 欧美刺激午夜性久久久久久久| 国产精品国产精品国产专区不蜜| 韩国视频理论视频久久| 欧美精品一区二区精品网| 久久久久国产一区二区| 欧美精品久久久久a| 在线一区二区三区做爰视频网站| 国语自产精品视频在线看一大j8| 亚洲综合视频一区| 牛牛精品成人免费视频| 午夜国产一区| 一区二区三区视频免费在线观看| 欧美电影打屁股sp| 午夜国产精品视频免费体验区| 黄色成人在线网站| 在线日韩日本国产亚洲| 国产精品自在欧美一区| 久久一区二区精品| 国产精品一区二区三区久久久| 91久久精品一区二区别| 欧美日韩黄视频| 亚洲第一网站| 国产精品久久久久高潮| 99国内精品久久久久久久软件| 日韩一二在线观看| 狠狠狠色丁香婷婷综合久久五月| 一区二区三区福利| 国产欧美日本在线| 一区二区三区免费在线观看| 欧美久久久久久| 亚洲人精品午夜| 亚洲小说欧美另类社区| 欧美美女视频| 亚洲日韩欧美一区二区在线| 乱人伦精品视频在线观看| 久久精品国产免费| 亚洲国产va精品久久久不卡综合| 亚洲三级色网| 国产在线观看精品一区二区三区| 中文成人激情娱乐网| 国产亚洲精品自拍| 欧美三日本三级少妇三2023| 久久久xxx| 国产精品三级视频| 久久精品日产第一区二区| 欧美精品日韩综合在线| 久久精品五月婷婷| 午夜视频在线观看一区二区三区| 欧美一区二区三区精品| 一区在线视频| 先锋a资源在线看亚洲| 国产精品欧美一区二区三区奶水| 欧美**人妖| 欧美一区二区高清在线观看| 久久久久久久波多野高潮日日| 欧美精品尤物在线| 久久精品国产第一区二区三区最新章节| 亚洲免费在线电影| 国产日本欧美一区二区三区| 亚洲电影免费观看高清| 一本色道综合亚洲| 久久综合99re88久久爱| 亚洲欧美一区二区三区在线| 榴莲视频成人在线观看| 午夜精品久久久久99热蜜桃导演| 久久久99国产精品免费| 欧美精品一区二区在线观看| 国产一区久久| 国产精品国产三级国产专播品爱网| 国产精品久久久久久久久久ktv| 久久精品国产精品亚洲综合| 久久精品国产第一区二区三区| 性xx色xx综合久久久xx| 国产精品免费在线| 国产午夜一区二区三区| 久久欧美中文字幕| 午夜国产精品视频免费体验区| 欧美久久久久久蜜桃| 欧美在线视频一区| 噜噜噜91成人网| 久久er99精品| 国产精品婷婷| 日韩亚洲一区二区| 国产精品亚洲精品| 国产资源精品在线观看| 牛牛国产精品| 国产精品videossex久久发布| 欧美日韩二区三区| 久久精品国产免费观看| 久久久久久欧美| 久久亚洲二区| 欧美成人精品| 一区二区三区在线视频播放| 国产麻豆成人精品| 欧美国产综合一区二区| 狂野欧美激情性xxxx| 国产精品久久国产三级国电话系列| 国产精品久久久久久福利一牛影视| 欧美精品在线观看| 欧美理论片在线观看| 亚洲午夜精品久久| 久久精品一区中文字幕| 国产精品自在线| 欧美激情自拍| 国产精品福利网| 欧美 日韩 国产一区二区在线视频| 狠狠综合久久| 日韩一区二区精品视频| 亚洲国产日韩美| 久久综合九九| 日韩一区二区精品在线观看| 欧美人与性禽动交情品| 久久视频在线视频| 国产精品日韩一区二区三区| 亚洲高清av| 久久精品视频在线|