<xmp id="uauy4"><u id="uauy4"></u>
  • <menu id="uauy4"><tt id="uauy4"></tt></menu>
    <xmp id="uauy4"><menu id="uauy4"></menu>
  • <menu id="uauy4"><strong id="uauy4"></strong></menu>
    <input id="uauy4"></input>
  • Language:CHINESESENGLISH

    Home > News > Installation point supported glass curtain wall supporting structural members shall comply with the requirements of
    CONTACT US
    • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
    • Phone:0757-81002668/0757-63323396
    • Fax:0757-81196682
    • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
    • E-mail:sbs@sbsprefabhouse.com
    • URL:http://www.uewkhdshfiueyhfsahd.com

    Installation point supported glass curtain wall supporting structural members shall comply with the requirements of

    Time:[2014-6-18]  Hits:5054

    Device point supported glass curtain wall supporting structural members shall comply with the following requirements:
    1, Foshan steel device during system holes, assembly, welding and painting processes should comply with "steel construction and acceptance criteria" of the relevant provisions of GB50205;
    2, a large steel structure should be hanging point plan and examination hanging;
    3, steel unit in place, tighten the adjustment should be timely and reporting concealed work;
    4, the steel components in the transport, storage and equipment damaged during coating and uncoated device convergence site,
    5, must be applied to pre-tension the steel rod and steel cable devices. Optional pre-tension dynamometer measurement should be consistent with the planning requirements. Should set the pre-tension adjustment.
    Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
    99久久精品国产亚洲