    Home > News > Guangzhou Steel Structure Installation general steps (more detailed)
    CONTACT US
    • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
    • Phone:0757-81002668/0757-63323396
    • Fax:0757-81196682
    • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
    • E-mail:sbs@sbsprefabhouse.com
    • URL:http://www.uewkhdshfiueyhfsahd.com

    Guangzhou Steel Structure Installation general steps (more detailed)

    Time:[2016-4-6]  Hits:5219

    Guangzhou Steel Structure Installation general steps (more detailed)

    Guangzhou Steel installation general steps:
    First, prepare the steel structure installation Guangzhou
    (one). Ready to work
     1, the construction organization design and construction organization design of steel structure installation should provide a brief description of the project before, comprehensive statistical quantities, the correct choice of construction machinery and construction method, layout reasonable installation sequence, mainly installed elaborate technical measures, developed strict quality standards and safety installation standard, serious preparation of project schedules, workforce planning and materials supply plan.
     2. Check the pre-construction inspection of construction before the retest, including acceptance, construction equipment and measuring instruments and inspection of steel components based.
    (1) Acceptance of Steel member steel members should be construction plans and specifications for acceptance. Steel member is transported to the site, the manufacturer shall provide factory certificate and the following technical documents:
     ① design and design modification documents;
     ② quality steel single or test report and supporting material;
     Test test data ③ high strength bolt friction coefficient;
     ④ plant one or two types of weld inspection reports;
     ⑤ steel members geometry inspection reports;
     ⑥ member list. Installation of this unit should be acceptance, and the actual condition of the structure retest. If the member is damaged in transit, require the production plant must be repaired.
    (2) inspection before installation and construction equipment and measuring instruments for important hoisting machinery, tools, wire rope and other accessories shall be tested to ensure reliable performance have to ensure the smooth and safe installation. When installing the measuring instrument has to be regularly assigned to the National Bureau of Standards testing unit for testing, calibration, to ensure accuracy of the measurement standard.
     3, based retest. Steel is fixed in reinforced concrete base (base, capitals, corbels, etc.) on. Thus the base and anchor bolt accuracy, strength to retest. To retest the base level of the base surface elevation, roughness, horizontal position deviation anchors, anchor bolts embedded in the accuracy of the determination made. And the retest results and corrective require delivery of the base construction unit.
     4, preparation of installation plans and component supply plan, organize construction.
     5, check the steel components: Steel Factory member should have factory certification, drawings before installation press review enumeration member, the member is installed in accordance with the order arrived within the scope of the installation, without affecting the installation conditions as far as possible on the installation member lower position to ensure the installation convenience.
     6, installation of steel columns: first determine before lifting member hanging position to determine banding method, take appropriate precautions when lifting. After lifting steel columns when the column foot anchor bolt from about 30-40CM when righting the mounting bolt hole pedestal alignment, slow-fall in place. After the beginning of the school to be vertical deviation within 20MM, tighten the bolts temporarily fixed to decoupling.
     7, steel girder lifting: lifting steel beams after completion of the review column, lifting into place using two symmetrical banding installation hoisting steel beams. After lifting steel beams from the column reference plane 100MM slowly slowly in place, be adjusted to be corrected hoisting steel beams, then a fixed connection. With hanging with the theodolite corrected any time to correct deviations when hoisting steel beams.
     8, wall purlins installation: purlin cross-section smaller, lighter, and more using a hook or a hanging piece lifting method for lifting. Purlin correction is mainly the size and spacing of their own flatness. Check with the kind of pitch along the rod to move back and forth between the bar purlin members, subject to error, to relax or tighten the bolts corrected. Flatness ruler with cable and calibration checks, and finally bolted.
     9, the installation correction
     ①. Steel Column Correction: vertical steel columns correction theodolite or hanging wire hammer test, when the deviation is corrected using the jack, jack the base elevation correction a little elevation, and then increase or decrease the thickness of the plate, tightly immediately after the column foot correction is correct after solid anchor bolts, steel columns until the correct overall correction pouring fine stone concrete column under the soles of the feet fixed.
     ②. Steel Beam Correction: steel beams and vertical axis of the measurement correction, the correction performed using the jack, fixed immediately corrected.

     (two). Wall plate mounting pressure-type color
    1. Preparation before construction
    ①, before the steel sheeting envelope construction and installation, custom corresponding construction drawings, and design and construction personnel training and production safety tests, according to the design documentation organization.
    ②, detailed check based on the file size and number of types of materials, damage to the pressure plate, flashing boards should be repaired and replaced.
    ③, various types of construction equipment should be complete, and can operate normally.
    ④, review and steel sheeting construction installation precision steel components relevant, clear coating installation weld spatter and purlins, and brushing the anti-rust paint for corrosion protection.
     2. Pressure-type color plate construction process: Siding installation by purlins from one location to start, must clenched between the board and the board, and then screws, drywall seams well water treatment. When the pressure plate is installed, it should be laid side edge to adjust its position, while fixed.
     (III). Floor bearing plate installation
     Before floor bearing plate construction, installation, drawing the appropriate row board diagram, according to the construction drawings. Pressure plate along one end of the floor to start laying, laying side edge to adjust its position, while fixed. Entrance case, install pressure plate, then cut the hole sizes according to the actual position of the hole.
     Second, the installation of steel Stability member monomer stabilization and structural overall stability
     1, the monomer component monomer stability stable member refers to a member at the site stack, from the pull, lifting, bending occurs in place during bending and torsion destruction and instability. Thus for thinner and larger member should consider this issue.
     2, the structure of the overall stability of the overall stability structure refers to the structure in the lifting process support system has not been formed, the structure must bear some of the load (including weight). Therefore, in the formulation of the lifting sequence must fully take into account this factor, to ensure that each step in the process of lifting the structure is stable. If the problem can be added other measures to resolve the temporary wind cable.
     Third, Guangzhou Steel installation and connection problems
     Live connection mainly ordinary steel bolts, high strength bolts connecting and welding.
     1, ordinary bolt connection, mainly used by ordinary bolt bending, pulling node. In the main bolt tension. Plus an appropriate prestressing, the shear structure are also used extensively for transmission towers and other connections. After ordinary bolt tightening, exposed threaded be not less than 2-3 button. Common locking bolt should measures, such as double-locking nuts or fastening nut. Bolt hole misalignment smaller reamer or rasp can be used to repair holes, gas cutting may not be used to repair holes.
     2, high-strength bolts, high strength bolts connecting ships directly for important structures to withstand dynamic loads in. Its main feature is to pass through the shear contact surface friction. Therefore, when high-strength bolts installed, practices and rough friction surfaces must be processed according to specifications. Secondly, also for the friction coefficient and torque coefficient test. When you install unscrew the torque to be measured at the beginning and end of the bolt screwing torque.
     3, site welding, site welding plant with welding inspection
     (1) the design of the site should be avoided in soldering
     (2) prevent the adverse weather conditions (rain, wind, cold climate) on construction
    (3) reduce the adverse welding station (construction site operation can not rotate, only overhead welding, it is difficult to even settled welding personnel) influence in the process of lifting the steel should pay attention to the problem of the column, when the beam is installed, the main inspection horn column beneath the floor mat whether real, pad level, whether vertical column and the availability of displacement, the degree of vertical and lateral bending vector high primary and secondary beam. After the installation of steel structures formed spatially fixed unit and acceptance, it will require the construction unit in time and space column base plate top surface of the secondary concrete pouring compacting expansion. Finally, we need to check the verticality of the main steel structure and the whole plane bending

     Fourth, the preparation before lifting.
           When the manufacture of steel columns in the column axis design draw feet, on top of the cover shells on cross control lines, control and vertical axis of bolt installation quality control for lifting. Bolted steel construction for general use bolts and high-strength bolts. Ordinary bolts, each bolt end can not be more than two pads gaskets, not use gas cutting reamer bolt holes, bolts tightened after the exposed thread pitch of not less than 2; key control for high-strength bolts bolted rubbing treatment (sandblasted) , anti-slip surface friction coefficient, tightening sequences applied bolting, screwing early final twist, twist applied torque value, the value of the exposed threaded bolt, the gusset plate surface damage and deformation. Installation plate contact surfaces should be smooth, the contact surface must be greater than 75%, the edge of the gap is not greater than 0.8 mm, high-strength bolts should be free to penetrate not be beat and reaming; high-strength bolts shall not be used as a temporary installation bolt, bolt should one direction, bolt mounting every day should be a final twist is completed, a final twist after completion should be individually checked for less twist, super twist should be screwed up or replaced.
    Steel Works important quality control points
    Embedded quality embedded anchor bolts, anchor bolts directly affect the quality of the installation of steel structures, control bolt (group) position, squareness, length and elevation, and the reaming adjustment to reduce workload (even avoid rework), improve the structural quality of the installation is important. The method can be directly embedded anchor bolts embedded method may also be set aside hole method.
     Fifth, the steel works rainy winter construction measures
     (A) Construction in Winter
     1. Winter construction steel structure fabrication and installation of steel strictly enforced in accordance with the relevant provisions of Winter Construction.
     2. The steel components making positive temperature negative temperature installation should be considered when members shrinkage based on differences in ambient temperature, and adjust the deviation to take technical measures in construction.
     3. Participation negative temperature steel construction welders should be subject to a negative temperature welding technology training, examination, and obtain the corresponding certificate.
     4. The connecting material steel and related negative temperature used be accompanied by a certificate of quality, performance and product standards meet the design requirements.
     5. The negative electrode for use at a temperature more than two hours can not be exposed, more than two hours to re-baking electrode baking times no more than 3 times.
     6. flux prior to use in accordance with regulations baked to a moisture content of not more than 0.1%.
     7. The negative temperature high-strength bolts used shall have a product certificate, and at negative temperature coefficient of torque, axial force re-inspection.
     8. The negative temperature steel structure used coatings not use water-based paints.
     9. The next member feed, should be reserved for the shrinking margin, welding shrinkage and compressive deformation amount should be coordinated with the shrinkage of steel produced in the negative temperatures.
     10. member assembly, according to the order prescribed in the process from the inside out extended group fight, do weld shrinkage experimentally determined values ​​need to be reserved at the time of negative temperature group fight.
     11. component assembly, remove the seam 50mm memory remain rust, burrs, dirt, oil, snow and other debris, dry and free of residual moisture holding seams.
     12. The negative temperature should be at least 9mm steel plate welded to the multi-layer welding, weld surfacing from the bottom up layer by layer, each weld once finished welding, such as welding interruption before applying again to clear welding welding defects. Arc welding is prohibited on the base material.
     13. Steel-site installation, in case of snow or wind speed 6m / s or more, the erection of protective shed.
     14. eradicate substandard weld re-welding, steel welding process in accordance with the provisions under the negative temperature welding.
     15. When the ambient temperature is below 0 ℃, before brushing anticorrosive paint brushing process test, component surface rust, oil, burrs and other things necessary to clean up brushing clean, and keep the surface dry. Snow or ice may not work on brushing member.
     16. Winter transport, steel anti-slip measures taken when stacking, stacking space formation member firm no puddles, no freezing ground. When the same type of members are stacked, members should be kept level, horn on the same vertical line, and prevent slippery member.
     17. Installation according to claim former steel negative temperature conditions, their quality retest of the production and transportation of missed stacking member deformed, repair correction on the ground.
     18. Hoisting ropes should use anti-skid steel members plus septum, and at the same time lifting the gusset plate member, installers need to use the fixtures and other things with a rope lashing firmly.
     19. Preparation of steel components installation sequence chart according to the temperature conditions, in strict accordance with the provisions of the order will be installed during construction.
     20. Preparation installation of steel structures welding process, both ends of a member shall simultaneously be welded.
     twenty one. Before installing remove member surface ice, snow, dew, but not damage the coating.
     twenty two. Negative temperature installation of pillars, main beam immediately corrected permanently fixed position correction right now, the day of installation space member to form a stable system.
     23. The high strength bolt friction joint fitting member may not have snow ice surface, no contact with dirt, oil and other stolen goods.
     24. The negative temperature steel installation quality addition to complying with "Steel construction and acceptance norms" (GB50250-95) requirements, but also according to the design requirements for inspection and acceptance.
     (B) the rainy season construction measures
     1. Rain construction, erection of temporary protection should be shed, rain may not fall on a hot weld. The welding site is wet, wipe with a dry cloth and must be in before the welding with oxy-acetylene flame to dry, keeping the seams dry, no residual moisture.
     2. When lifting, the member if water should be cleaned before installation, but not damage the coating, high-strength bolts when fitting installation member friction surface should be clean, can not have drops, not rain and exposure to dirt and oil and other dirt.
     3. member rainy weather can not be brushing work.
     4. The rain and wind can not be more than five roof insulation construction.
     5. Because of the rain the air is moist, the electrode should be moisture storage and baked, repeat the same electrode baking times should not exceed twice by management in a timely manner grilled record.
     6. The case of windy weather, columns, beams, and other large supporting member should be corrected immediately, permanently fixed immediately after the position correction is correct, to prevent unilateral instability that day installation member, should form steric stabilization system.

    Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
    日本欧美一区二区三区不卡视频_亚洲欧美日韩中文字幕一区二区_日韩免费视频一区二区_欧美黑人粗大猛烈18p
    <xmp id="uauy4"><u id="uauy4"></u>
  • <menu id="uauy4"><tt id="uauy4"></tt></menu>
    <xmp id="uauy4"><menu id="uauy4"></menu>
  • <menu id="uauy4"><strong id="uauy4"></strong></menu>
    <input id="uauy4"></input>
  • 夫妻av一区二区| 综合中文字幕亚洲| 91日韩精品一区| 久久久久久夜精品精品免费| 成人免费高清在线| 樱花影视一区二区| 91精品婷婷国产综合久久性色| 色悠悠久久综合| 亚洲一区二区在线观看视频| 国产乱码精品一区二区三| 亚洲一区二区三区四区中文字幕| 色av成人天堂桃色av| 中文字幕成人av| 一区二区三区精品在线观看| 亚洲一区二区在线免费看| 亚洲成人av在线电影| 男男视频亚洲欧美| 欧美v国产在线一区二区三区| 久久久亚洲午夜电影| 亚洲人亚洲人成电影网站色| 欧美日韩国产经典色站一区二区三区| 国产在线播放一区二区三区| 久久综合九色综合欧美就去吻| 日韩av一区二区在线影视| 亚洲国产精品综合小说图片区| 555夜色666亚洲国产免| 乱一区二区av| 欧美午夜精品理论片a级按摩| 99这里都是精品| 99国产精品国产精品毛片| 蜜桃精品视频在线观看| 日韩欧美精品在线| 国产一区二三区好的| 免费观看成人鲁鲁鲁鲁鲁视频| 日韩三级电影网址| 国产精品护士白丝一区av| 精品一区二区免费| 日本亚洲电影天堂| 亚洲欧美日韩国产手机在线| 91丝袜美女网| 美女网站在线免费欧美精品| 亚洲国产精品精华液网站| 久久久不卡网国产精品二区| 一本一本大道香蕉久在线精品| 亚洲成人免费看| 久久青草国产手机看片福利盒子| 亚洲日本乱码在线观看| 亚洲一区二区精品视频| 国产精品久久国产精麻豆99网站| 日本强好片久久久久久aaa| 免费在线观看视频一区| 亚洲美女视频在线| 丰满少妇在线播放bd日韩电影| 欧美性大战久久| 亚洲3atv精品一区二区三区| 一区二区三区 在线观看视频| 国产成都精品91一区二区三| 日韩欧美不卡一区| xnxx国产精品| 欧美不卡激情三级在线观看| 开心九九激情九九欧美日韩精美视频电影| 91网上在线视频| 一区二区三区日韩| 日韩精品一区二区三区蜜臀| 精品伦理精品一区| 日韩精品一区二区三区视频| 精品国产制服丝袜高跟| 欧美无人高清视频在线观看| 91一区二区三区在线观看| 国产精品网站在线| 欧美日韩久久一区二区| 夜夜揉揉日日人人青青一国产精品| 在线观看一区不卡| 国产欧美一区二区在线| 97久久人人超碰| 麻豆精品蜜桃视频网站| 全部av―极品视觉盛宴亚洲| 欧美日韩中文精品| 久久综合九色综合久久久精品综合| 亚洲成人免费看| 国产不卡视频在线播放| 国产91色综合久久免费分享| 亚洲欧美日韩国产综合在线| 99视频热这里只有精品免费| 国产精品护士白丝一区av| 久久精品久久久精品美女| 色哟哟在线观看一区二区三区| 欧美日韩中文另类| 午夜欧美一区二区三区在线播放| 五月婷婷综合激情| 欧美一区二区三区思思人| 日韩美女天天操| 午夜影视日本亚洲欧洲精品| 国产精品毛片无遮挡高清| 国产日韩高清在线| 欧美日本免费一区二区三区| 欧美日韩一区二区在线观看视频| 综合电影一区二区三区| 一本久久a久久精品亚洲| 亚洲精品一区二区三区精华液| 不卡电影一区二区三区| 亚洲你懂的在线视频| 色婷婷国产精品| 久久久久久久久97黄色工厂| 天堂成人免费av电影一区| 91小视频免费看| 国产毛片精品国产一区二区三区| 免费人成精品欧美精品| 蜜臀va亚洲va欧美va天堂| 亚洲一区二区视频在线观看| 国产欧美视频在线观看| 91精品在线免费观看| 欧美一级午夜免费电影| 国产黄色成人av| 亚洲视频一区在线观看| 亚洲一区中文在线| 欧美日韩精品一区二区三区| 美国三级日本三级久久99| 成人动漫一区二区三区| 欧美日韩一区二区电影| 日韩免费成人网| 91精品久久久久久久91蜜桃| 99视频精品全部免费在线| 在线视频你懂得一区| 国产91色综合久久免费分享| 欧美激情资源网| 国产a久久麻豆| 日韩欧美一区电影| 国产精品一区三区| 亚洲乱码国产乱码精品精小说| 国产日韩欧美制服另类| 亚洲成a天堂v人片| 麻豆精品精品国产自在97香蕉| 69堂成人精品免费视频| 精品欧美乱码久久久久久| 国产精品久久久久永久免费观看| 欧美亚洲国产bt| 亚洲精品欧美二区三区中文字幕| 欧美日韩视频在线观看一区二区三区| 欧美一区二区二区| 91精品婷婷国产综合久久性色| 国产精品国产三级国产a| 麻豆国产精品官网| 欧美三区在线视频| 欧美唯美清纯偷拍| 久久一留热品黄| 日本电影亚洲天堂一区| 亚洲成a人v欧美综合天堂下载| 欧美午夜不卡视频| 亚洲美女淫视频| 亚洲欧美怡红院| 国产精品18久久久久久久网站| 国产风韵犹存在线视精品| 日韩电影免费在线看| 欧美综合在线视频| 91国偷自产一区二区开放时间| av激情亚洲男人天堂| 在线日韩一区二区| 99精品黄色片免费大全| 欧美卡1卡2卡| 91精品国产黑色紧身裤美女| 久久这里只有精品首页| 国产日韩av一区二区| 成人av免费观看| 成人午夜又粗又硬又大| 国产视频一区在线播放| 亚洲午夜免费电影| 欧美日韩国产精品成人| 99vv1com这只有精品| 亚洲成av人片一区二区| 久久国产综合精品| 蜜芽一区二区三区| 奇米精品一区二区三区四区| 久久福利视频一区二区| 欧美色男人天堂| 精品国产免费视频| 国产女主播一区| 亚洲精品国产一区二区三区四区在线| 麻豆成人综合网| 欧美电视剧免费全集观看| 日本不卡高清视频| 欧美精品1区2区3区| 日本中文字幕一区| 精品久久久久av影院| 99在线精品一区二区三区| 亚洲综合一区二区精品导航| 丝袜美腿成人在线| 亚洲国产岛国毛片在线| 欧美在线看片a免费观看| 成人一区二区在线观看| 成人午夜在线播放| 日本在线观看不卡视频| 亚洲精品国久久99热| 国产999精品久久久久久绿帽| 99re8在线精品视频免费播放| 色噜噜狠狠一区二区三区果冻| 亚洲精品中文字幕在线观看| 亚洲精品国产无天堂网2021| 欧美精品自拍偷拍动漫精品| 国产精品黄色在线观看|