日本欧美一区二区三区不卡视频_亚洲欧美日韩中文字幕一区二区_日韩免费视频一区二区_欧美黑人粗大猛烈18p

9000px;"><xmp id="uauy4"><u id="uauy4"></u>
  • <menu id="uauy4"><tt id="uauy4"></tt></menu>
    <xmp id="uauy4"><menu id="uauy4"></menu>
  • <menu id="uauy4"><strong id="uauy4"></strong></menu>
    <input id="uauy4"></input>
  • Language:CHINESESENGLISH

    Home > News > Precautions Foshan Steel Design
    CONTACT US
    • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
    • Phone:0757-81002668/0757-63323396
    • Fax:0757-81196682
    • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
    • E-mail:sbs@sbsprefabhouse.com
    • URL:http://www.uewkhdshfiueyhfsahd.com

    Precautions Foshan Steel Design

    Time:[2016-6-15]  Hits:4738

    Followed by the State to vigorously promote Prefabricated construction today, Foshan steel construction and more subject to our attention. The following are some of Foshan Steel watch point plan for us to see.
    A Frame
    ⑴ portal frame should first determine whether there is a crane, such as plant demand resettlement process requests crane, you should note the following: ① column foot should be planned into a rigid column base; ② column should be planned into uniform section column; ③ between support columns by longitudinal horizontal crane load control programs, rather than a simple construction planning, when there are no less than 5 t crane when, should use steel support. As no crane portal frame, press columns and other practices planning a wedge, not repeat them.
    Room ⑵ column support resettlement
    Between the columns support the roof support pillar should be placed in the same room, so that the formation of a stable system of longitudinal frame, frame means to facilitate and increase the longitudinal stiffness. Support should be placed between the top of the second column by column from time to time, when placed in the second inter-column list when the appropriate placement of a rigid column tied, and the rigid tie rod and the wind column longitudinal orientation together, make a direct transfer wind loads. The turning point in the frame (single-span roof of the house and column capitals and some centers and multi-span pole in the house and the roof) should be set rigid Tied houses along the entire length. When larger span gantry in place between support columns should be appropriate to increase the number of rigid tie rods that support the angle is about 45 °. When the construction of functional constraint that can not be disposed between the support column, should be placed longitudinal frame. And that they've done this to make a rigid connection between the end of the column beams, studs and then cancel the support of engineering, construction make placement more flexible, with good results.
    ⑶ roof and wall construction
    Roof and wall construction approach is to increase the stiffness of the frame, the key way to avoid the outer frame plane instability. Purlins, wall beams generally composed of cold-formed thin-walled structures formed when the column spacing less than 6 m, when designing a brace, more than 6 m, located two brace. Here should be mentioned especially the oblique bars, school diagram process, we often see a lot of steel structure manufacturers or planners provided the oblique strut bar without setting conditions. Factor is the construction concept is not very clear, because after construction mechanics, disposed between the oblique strut bar, before the formation of a stable system. In the roof, walls planned resettlement should also be noted bracing, bracing is not a luxury it is to avoid perverting the compression flange provided. Studies have shown the first portal frame damage due to pressure caused by perverting the largest flange. Oblique inner flange beams converge at the column flange and frame is the emergence of perverting vital parts, there is provided bracing is very important. In addition, the "portal frame light house steel construction technical specification" CECS102: 2002 (hereinafter referred to as CECS102: 2002) rules: oblique beams in the bottom flange of the compression zone is also set bracing, a distance not greater than the corresponding compression wing edge width of 16 (235 / fy) 0.5 times. When you press a general portal frame, purlin distance of about 1500 mm, a spacer is provided a bracing purlins above conditions can be satisfied.
    ⑷ shear key
    "CECS102: 2002" rules: column anchor should not be used to withstand the horizontal shear column foot portion, the horizontal shear force by friction between the floor and the concrete foundation (friction coefficient desirable 0.4) or set shear joints bear. This is the time of our accounting mast, usually displayed warning: "Let Shear pedestal demand!"
    Analysis of these factors, the main door is made generally lighter weight structure, column friction soles of the feet and between the concrete foundation is small enough to resist lateral wind loads and seismic effects, it should set the shear key. Usually the shear key beam with angle iron or steel, the shear bearing capacity of the cross section of the weld should be accounted for, columns and soles of the feet of open space between the surface of the foundation secondary grouting. Specifically refer to "many high-rise residential construction steel structure node configuration detail" 01SG519 diagram on page 30 to gather a large sample 1,2 practices.
    Means for positioning the column anchor ⑸
    This is the planners generally ignores questions and anchors positioned in engineering practice inaccuracy or rigid frame construction of the device difficult project case everywhere, we also encountered such a situation, and later had to reinforcement. Analysis of factors, notably the non-convergence between the anchors, the overall stiffness of the poor in the process of pouring concrete in the anchor inevitably shift. In response to these factors, taken before pouring concrete column anchor embedded fixation process, the specific approach shown in Figure 1. Mounting bracket and bolt to form a small lattice columns, positioned so the anchor would facilitate accurate. ⑹ wind columns and frame the current convergence of wind portal frame column planning practice there are two mistakes: one is the wind column and frame made of the same wind columns and beams or hinged frame or just then, the wind column to both wind and participate vertical load effect and the effect of the horizontal level. The planners do not usually do such a frame of longitudinal wind checking. This is done omissions load, Project Planning is a taboo. I think you are a force bent structure that clearly should not complicate it by force. This approach is defective; Another approach is to wind column and frame on one axis, but do not think that wind column vertical load effects wind between columns and beams with a steel frame after welding joints connected. This practice is still a part of the vertical load transmitted to the column of wind, and the steel sheet is small lateral stiffness, vertical load at the onset of the effect is difficult to ensure that there is barely after the land transfer the wind load. These two approaches have disadvantages. Here we recommend the following practices:
    Plant selection do legal grids, Pin top frame column axis wind shifted 500 ~ 600 mm, wind through the column flange adapter plate is connected to the frame beam stiffeners and plate convergence and vertical stiffener open a long hole, use an ordinary bolt adapter bolts approach shown in Figure 2. Figure 2 wind column and frame adapter bulk sample
    Plan 2 steel structure
    Select ⑴ steel building systems
    Common constructions of steel construction system can be divided into pure and construction - support systems into two categories. Highly selective and construction material systems, the use of closely-related features. This requires the construction engineer should work closely with the architect, when the construction of functional constraint can not be set because the support system should be used pure structure. Pure system configuration because no anti-sway support, two vertical and horizontal directions to satisfaction, "the construction of earthquake planning standards" GB50011-2001 (hereinafter referred to as "anti-regulation") Section 5.5 of the elastic layer between the displacement angle less than or equal request 1/300, beam the column in vertical and horizontal directions should just pick; because of "anti-regulation" section 8. 3.4 rule: "when the column in two mutually perpendicular directions and beam rigid connection, should use box-section" Therefore, use of pure construction system, usually planning to box column column column inside the box but the process of applying rust and proper maintenance difficult, which is steel construction planning a major problem. They are also trying to choose the column method of pouring concrete in the plan, but because the box column separator disposed stiffening node area, pouring concrete very difficult; on the other hand, the country is still in the concrete pipe during the discussion, common planning software can not be accounted for accounting theory in the Journal of the different. Based on the above factors when planning constructions of pure steel, most still use non - concrete box section column. Own labor process selected word column strong and weak axes are rigid convergence algorithm, according to the "anti-regulation" section of Article 8.3.4 of the text is selected, "should", see also the mainland large selection of drawings and Planning Institute said planning in spreadsheets method, but calculation results are not satisfactory, the elastic layer between the weak axis direction displacement angle is still unable to meet the request, "anti-regulation" of Article 8. 3.4. Because the box column in the structure of some tough, so the idea when planning a multi-layer steel cylinder-shaped house built try to use planning to construct - support system. Construction engineers and construction division to coordinate as much as possible, through resettlement in demand resettlement support bearing floor, elevator, which do not open big hole in the wall to achieve the support of stealth. The results indicate the accounting practice engineering, construction support displacement control effect is very good, so that in addition to the choice of column-shaped material saving, anti-rust, the use of easy maintenance, easy convergence weak axis direction, it is a useful method.
    ⑵ node Planning
    Steel structure node planning is the key to planning steel structure. Hinged nodes simple, clear contact mechanics, where not too much to say, just focus on what connected node planning. Moment resistant convergence plan, "anti-regulation" 8 3.4 Recommended use Standard Figure 8. 3.4 - The node 1 in the form, in engineering practice are mostly chosen is such a node. This node has two accounts in accordance with: accurate programming and general programming. The difference between the two is that the former Reflections bending and shear webs, the latter only ponder web shear. Accurate planning law planning in practice, difficult bending webs satisfied request must be thickened to a large extent the web. The approach is very thick web of economic, so most use common project planning method, this accounting model Mechanics clear, simple accounting, but must pay attention to planning to take measures to strengthen the earthquake, such as the use of the plastic hinge relocation enhanced convergence or end of the beam away from the beam ends not far from the upper and lower flange beams weaken dog bone convergence. This is because, in the end without any reinforcing beam flange case, only ponder web convergence shear bolts bear, bear moment by the flange weld, then weld flange flexural capacity of only about 80% capacity BEAMS (that is, only beams with the section modulus of the beam flange section modulus of about 80%), then press the "steel construction planning standards" on page 3. 2.2, thinking construction site conditions weld strength reduction factor 0 is multiplied by the value of planning. 9, then the flexural capacity of the beam flexural capacity of Cohesion only 70% to 75%. This strong convergence node ratio is even lower 30% to 25%, in violation of the "earthquake not fall," the basic principles of earthquake "strong nodes, weak bars." Based on the above factors, it should be used "many high-rise residential construction steel structure node configuration detail" earthquake shown on page 19, 20 01SG519 portfolio strengthened approach.
    Else
    In our "anti-regulation" and "the Rules" the rules were not steel structure seismic level, just 12 minutes and 12 layers or less standard and two or more layers. I thought it was relative to our vast big difference around the fortification is characterized by inappropriate. Old "the Rules" in the multi-set size of a house built high-rise steel expansion joints no rules, only single industrial plant made some rules. These two points are the conceptual big question, "the Rules" does not emphasize these two points is appropriate.
    Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
    日本欧美一区二区三区不卡视频_亚洲欧美日韩中文字幕一区二区_日韩免费视频一区二区_欧美黑人粗大猛烈18p
    <xmp id="uauy4"><u id="uauy4"></u>
  • <menu id="uauy4"><tt id="uauy4"></tt></menu>
    <xmp id="uauy4"><menu id="uauy4"></menu>
  • <menu id="uauy4"><strong id="uauy4"></strong></menu>
    <input id="uauy4"></input>
  • 91久久精品国产91久久性色tv| 国产午夜精品在线观看| 一区在线电影| 欧美性生交xxxxx久久久| 国产一区二区三区观看| 在线日韩电影| 久久免费高清| 亚洲直播在线一区| 亚洲精品免费观看| 亚洲日本在线观看| 亚洲人成小说网站色在线| 国产精品久久久久av免费| 亚洲欧美国产另类| 久久中文精品| 欧美性事在线| 欧美日韩在线一区二区三区| 亚洲在线一区二区| 欧美精品久久久久久| 欧美区国产区| 亚洲综合精品四区| 久久久人成影片一区二区三区观看| 国产精品国产一区二区| 美女爽到呻吟久久久久| 午夜一级在线看亚洲| 亚洲午夜电影| 一区二区三区蜜桃网| 国产日韩欧美一区二区三区在线观看| 欧美日韩综合一区| 老司机67194精品线观看| 91久久精品日日躁夜夜躁欧美| 欧美亚州一区二区三区| 国产精品嫩草久久久久| 久久九九久精品国产免费直播| 欧美欧美午夜aⅴ在线观看| 亚洲乱码视频| 欧美精品在线网站| 亚洲国产成人午夜在线一区| 牛牛影视久久网| 国产精品免费在线| 亚洲电影av在线| 欧美日韩午夜视频在线观看| 久久精品av麻豆的观看方式| 国内自拍一区| 亚洲精品国产拍免费91在线| av成人毛片| 欧美日韩中文另类| 欧美精品日本| 亚洲精品欧美在线| 玖玖玖免费嫩草在线影院一区| 欧美一级二级三级蜜桃| 免费观看国产成人| 国产午夜精品理论片a级大结局| 欧美日韩情趣电影| 欧美一区91| 奶水喷射视频一区| 久久av资源网站| 国产欧美精品日韩区二区麻豆天美| 欲色影视综合吧| 亚洲欧美日韩另类精品一区二区三区| 欧美激情五月| 国产精品乱子久久久久| 久久久噜噜噜久久中文字幕色伊伊| 久久精品72免费观看| 伊人春色精品| 99亚洲视频| 黑人一区二区| 国产精品久久夜| 国产精品久久国产精麻豆99网站| 欧美中文字幕精品| 国产精品久久久久aaaa樱花| 久久免费国产精品| 亚洲人成亚洲人成在线观看图片| 午夜精品视频在线观看一区二区| 久久久久久久久久久久久久一区| 久久精品官网| 亚洲黄色免费网站| 国产亚洲精品成人av久久ww| 欧美精品自拍偷拍动漫精品| 国产精品嫩草久久久久| 久久午夜电影网| 麻豆精品在线视频| 久久美女性网| **网站欧美大片在线观看| 欧美精品一区二区三区视频| 亚洲一区二区精品在线观看| 欧美午夜大胆人体| 伊人婷婷久久| 在线视频欧美精品| 激情欧美日韩| 午夜精品久久一牛影视| 欧美日本亚洲韩国国产| 性欧美8khd高清极品| 亚洲精品一级| 亚洲国产精品久久久久婷婷老年| 亚洲黄色有码视频| 国产乱理伦片在线观看夜一区| 亚洲一区二区日本| 欧美日韩一区二区三区| 国产精品视频最多的网站| 在线观看日韩| 国产精品在线看| 伊人精品久久久久7777| 亚洲精品免费一二三区| 欧美在线亚洲在线| 免费在线观看一区二区| 国产精品日日做人人爱| 在线电影一区| 一级日韩一区在线观看| 在线免费高清一区二区三区| 国产精品午夜春色av| 亚洲国产小视频在线观看| 欧美sm极限捆绑bd| 国产精品永久免费视频| 韩国av一区二区| 伊人影院久久| 久久人人97超碰人人澡爱香蕉| 国产一区二区三区的电影| 91久久极品少妇xxxxⅹ软件| 久久av一区二区三区漫画| 久久久无码精品亚洲日韩按摩| 亚洲自拍偷拍麻豆| 最近中文字幕mv在线一区二区三区四区| 美女日韩欧美| 在线播放亚洲| 欧美日韩黄视频| 国产精品你懂的在线欣赏| 欧美性开放视频| 国产欧美一区二区三区在线看蜜臀| 亚洲五月六月| 欧美激情1区2区| 久久综合给合久久狠狠狠97色69| 国产亚洲成人一区| 99精品国产在热久久下载| 亚洲美女少妇无套啪啪呻吟| 中文av一区二区| 在线综合欧美| 黄色精品网站| 亚洲在线观看视频网站| 欧美视频免费在线观看| 香蕉尹人综合在线观看| 国产精品久久久久999| 136国产福利精品导航网址应用| 亚洲美女黄色片| 久久精品欧美日韩精品| 欧美精品午夜视频| 日韩亚洲一区二区| 欧美亚洲日本一区| 欧美片第一页| 久久大综合网| 先锋影音久久久| 欧美v国产在线一区二区三区| 亚洲一区在线观看视频| 性欧美大战久久久久久久久| 亚洲国产va精品久久久不卡综合| 欧美日韩在线不卡一区| 亚洲免费不卡| 欧美国产精品久久| 国产午夜精品视频免费不卡69堂| 欧美日韩在线一区二区| 国产精品伦子伦免费视频| 久久久久久久999| 欧美日韩二区三区| 一区二区高清| 亚洲国产精品一区二区尤物区| 国产精品无人区| 亚洲欧美日韩综合国产aⅴ| 亚洲国产欧美一区二区三区同亚洲| 国产一区二区三区黄| 欧美高清免费| 欧美性开放视频| 亚洲免费影视第一页| 国产亚洲午夜高清国产拍精品| 亚洲天堂网在线观看| 欧美成人一区二区在线| 国产伦精品免费视频| 亚洲精品久久嫩草网站秘色| 欧美影院成年免费版| 欧美区视频在线观看| 久久国产精品一区二区三区四区| 国产在线精品二区| 国产精品极品美女粉嫩高清在线| 久久亚洲精选| 日韩视频―中文字幕| 国产亚洲成精品久久| 欧美日韩亚洲免费| 欧美日本韩国一区二区三区| 亚洲国产精品高清久久久| 在线亚洲免费| 欧美黄色免费网站| 欧美国产综合| 精品1区2区| 国产精品黄页免费高清在线观看| 亚洲午夜av| 欧美精品日韩www.p站| 久久成人18免费网站| 今天的高清视频免费播放成人| 国产综合香蕉五月婷在线| 国产性猛交xxxx免费看久久| 久久综合狠狠综合久久综合88| 亚洲男人第一网站|